08/20/2017 Monrovia Depot Rehab Progress


Time for another photo update on the work being done at the Monrovia Depot:

*Click on the photos for larger images*


Quite a bit has been added to the cover over what will be the outdoor dining area on the east side of the building.  You can get a much better sense of the design and how that will look when completed.



A lot of the exterior has been patched up, new paint on the tallest section of the building and new roof in progress.  Can't really see in the photo, but the heavily damaged south facing side of the building is being repaired.



Just as a reference, here's a photo from August 5th, 2017.

Comments

Popular Posts